Sant Pau Hospital, Barcelona, Spain

Barcelona, Spain
In total, 300 meters of renovated pipe
In partnership with Hidrotech

“ElastoFlake’s versatility made it the perfect choice for this project, as it can be used alongside other pipe renovation solutions. A combination of two applied systems were used for the renovation – Relining coating solution and liner system.”

PROJECT IN A NUTSHELL

·   Renovation of 16 concrete and PVC pipes, diameter of 120 mm, longitude from 6 to 24 meters.

·   In total, 300 meters of renovated pipe

·   A combination of two applied systems were used for the renovation – Relining coating solution and liner system

·   In partnership with Hidrotech